1
Initial meeting
discuss scope of work and budgets.
2
Recap of scope of work to client.
3
Revisions to scope of work to client.
4
Approval of scope of work
to Kevin McPhee+ Associates.
5
Design Contract to Client for approval.
6
Preliminary designs to client..
7
Design revisions by Kevin McPhee + Associates.
8
Design revisions to client for approval. Billing of design drawings.
9
Necessary TItle 24’s or engineer drawings started.
10
Final packaging of design drawings, engineering, and other necessary drawings to client and city. Contractor bidding process begins.
11
Approval of contractor bids.
Building permit from city, work begins.
12
Periodic billing during building process from contractor.
13
Final walk through, corrections as needed.
Final biling from contractor
14
Decorating and painting begins. Periodic billing from painters and Kevin McPhee + Associates..
15
Final walk through, corrections as needed. Final biling from painter. Final billing from Kevin McPhee + Associates.